The brand

Products

Tools

Environment

Producers

Installation and maintenance

ISOLAR GLAS panes are delivered sandwiched between corks, which allows air to circulate among them. ISOLAR® GLAS panes must not be handled until the sealant has completely polymerised. (approximately 24 hours).

 

Pieces must not be transport or storage on work sites in groups of more than 40 cm , and they must not be stored or transported on a hard surface. Groups of panes must not be stored in places where they are exposed to meteorological elements, especially the sun, as this can lead to damage caused by heat absorption and accumulation.

 

ISOLAR® GLAS panes are delivered sandwiched between corks, which allows air to circulate among them. These corks should be left in place during transport and for the entire time the glass is in storage.

When installing ISOLAR® GLAS it must be remembered that the glass must never come loose as a result of any stress to which it is subjected (wind, its own weight, etc).

 

All products must be correctly installed according to the the instructions and regulations in the official "NTE" (Technical Building Rules) published by the Ministry of Development.


Web map | Contact | Legal information
Copyright Vitro Cristalglass 2006